Campaign Progress The Campaign for the Students of San Joaquin Memorial supports creating a campus-wide learning environment that unleashes the potential of every student every day, and where the campus—like all Memorial programs—embodies our commitment to excellence. This summer, thanks to generous donations from supporters like you, we have been able to begin much-needed updates to various parts of the campus, including painting and starting renovations to the Diener Academic Center.
Thank you for supporting the leaders of tomorrow!
Project Updates
Campus Paint
The campus got a refresh with new paint. The classroom arcades have gotten a fresh coat of white paint with brown trim, bringing a fresh and vibrant look to the campus.
Academic Center Maintenance staff were hard at work in the Diener Academic Center this summer. The Center was renovated and got new paint inside and out. The goal was to transform the Academic Center into a state-of-the-art learning space where students can come together to create, invent and learn. The center is a space for student learning and collaboration. Comfortable and open, with ample space, the renovation will better serve the learning needs of all of Memorial's students.
Air Conditioning The bid for a new air conditioning system for the Memorial gym has been awarded. The system will likely be installed this school year and bring a new level of comfort to the gym for games and Mass. Phone Upgrade In addition to physical campus improvements, a new phone and PA system was also recently installed (pictured above being installed). The phone upgrade is much needed as a way to interconnect the campus with the latest communications technology. Connect with us
Kommentare